How to Measure a Driveway Opening for a Custom Gate
The gate is made to the opening — not the other way round
Almost every custom gate that arrives wrong was measured wrong. Not because the buyer is careless, but because a driveway has more dimensions than the two obvious ones.
A tape measure gives you width and height. A gate also needs to know how thick your piers are, how much the driveway slopes, where the ground level will finish after paving, and how far the leaf can travel when it opens.
This guide covers the five measurements we ask for before we cut a single profile.
What you need
- A tape measure of at least 8 m, or a laser measure
- A second person to hold the end
- A pencil and paper (or your phone's notes)
- A spirit level, or a straight edge with a marble
1. Clear width — between the piers, not between the walls
Measure the narrowest point between the two inner faces of the piers. If the piers are not parallel, measure at the top, the middle and the bottom, and send all three.
Do not measure wall face to wall face. Gates are fixed to the pier, so the pier's inner face is the real datum.
2. Clear height — from finished ground level
Height is measured from the level the ground will be after paving, not the current dirt.
If you are laying 80 mm of stone, subtract that from today's measurement. Otherwise the gate will scrape the driveway the first time it rains and the paving settles.
Measure at both piers and at the centre. If the ground slopes, the gate is built to the lowest point and the gap is closed with a bottom rail.
3. Pier dimensions and material
For each pier, note:
- Width and depth of the pier itself
- What it is made of — brick, concrete, stone, or steel post
- Whether it is already built or still to be poured
This decides the fixing: cast-in anchors through the pier, or a bracket bolted to a steel post. It also decides the maximum leaf weight the pier can take.
4. Ground slope and level difference
Stand at one pier and sight across to the other. Note the height difference, even 20 mm matters.
For a swing gate, the leaf has to clear the ground as it swings through the arc. On a slope, we either build a raked bottom rail or fit a taller operator.
5. Opening clearance and swing or slide space
- Swing gate: how far does each leaf travel? Is there a wall, a hedge, a parked car in that arc? Note the obstruction distance.
- Sliding gate: how much free wall or fence is there for the leaf to slide along? The gate needs roughly its own width plus 10% of parking space.
Send us this, and we can quote without a site visit
One sketch with numbers beats five photos. Take a photo of your paper sketch, plus:
- A front-on photo of the whole opening
- One photo looking along the driveway, showing the slope
- One close-up of a pier
Write the five numbers on the sketch. We return a shop drawing with profile sections and a fixed price, usually within two working days.
Tolerances
We fabricate to ±1 mm. Site openings typically vary by ±5 mm, so we build in a 10 mm adjustment on the hinge side. That is why the pier dimensions matter as much as the opening width.
The five numbers, in one line
Width between pier faces · height from finished paving · pier width and depth · slope across the opening · free travel space for the leaf.
Send those five and nothing is left to guess.