What Is Actually Included in a Smart Gate Package?
"Smart" means nothing until you list the parts
Two suppliers can both call a gate "smart". One sends a motor in a box. The other sends a system that opens, closes, stops when a child walks under it, and still works when the power is out.
The difference is not the word. It is a list. Here is the list we work from, and the questions to ask any supplier before you compare prices.
The eight parts
1. The leaf and the frame. The gate itself. Ask for the frame wall thickness in millimetres, and whether the leaf weight is stated — because the operator is sized from that number.
2. Hinges or carriages. A swing gate runs on hinges that carry the whole leaf; a sliding gate runs on rollers and a track. These are the parts that fail first. Ask what they are made of — cast stainless, or plated steel that will rust at the coast.
3. The operator. Sliding or swing, and 24 V or 230 V. 24 V is the safer choice: it runs on low voltage, battery backup is straightforward, and it stops on obstacle detection with far less force.
4. The control board and receivers. Where the remote, keypad and intercom connect. Ask how many channels, and whether it accepts a wired input for a gate loop or a push button.
5. Safety devices — the part cheap quotes leave out. Photocells across the opening, and a safety edge on the closing stile. Without them the gate closes on whatever is in the way. This is the single most important line to check.
6. Access control. Keypad, fobs, video intercom, or a phone app. Each is a separate device; "smart" does not automatically include all of them.
7. Power and backup. Mains, solar panel with battery, or both. Solar sizing depends on how many cycles per day, not on the panel's physical size — ask for the calculation.
8. Wiring, drainage and the mechanical stop. Cable gauge and run length, a drain under the track so it does not fill with water, and a physical stop so the leaf cannot overrun if a limit switch fails.
The checklist to send a supplier
Copy this into your email. The answers tell you more than any brochure.
| Ask | Why it matters |
|---|---|
| Frame wall thickness (mm, actual) | Determines weight and rigidity |
| Leaf weight and leaf width | The operator is chosen from these two numbers |
| Operator brand, model, voltage | 24 V vs 230 V changes the whole wiring plan |
| Are photocells included? | Safety, and often the hidden cost gap |
| Safety edge on the closing stile? | Protects children and pets, mandatory in many markets |
| Manual release key supplied? | You need it the day the power fails |
| Battery backup or solar — sizing shown? | Otherwise it works in summer and dies in winter |
| Number of remotes and channels | One remote per household member is the norm |
| Cable gauge and maximum run | Wrong gauge means voltage drop and phantom faults |
| What is the warranty on the operator vs the gate | Usually two different periods |
Three mistakes buyers make
Buying the motor separately to save money. The operator must match the leaf weight and the leaf's travel. A motor bought on price alone either strains or refuses to move a heavy leaf, and the warranty argument afterwards is unwinnable.
Skipping photocells because the gate is on a private driveway. The gate does not know the difference between a car and a child on a bicycle.
No manual release. When the power fails — and it will — the only way in is to dismantle the operator, unless a release key was supplied.
What to test the day it is installed
- Open and close three times with the remote — listen for a change in motor sound
- Walk through the beam while closing — the gate must reverse immediately
- Press the safety edge while closing — same
- Cut the mains power — the manual release key must open the leaf by hand
- Leave it closed overnight, then check the battery indicator if a backup is fitted
If any of the five fails, the system is not finished, regardless of how it looks.
How we supply it
Every gate we ship can leave with the operator, photocells, safety edge, keypad or intercom, and solar supply already matched to the leaf — because we size the operator from the same drawing we build the gate from.
If you already have an operator on site, send its model and rated leaf weight, and we will build the gate to suit it instead.